Capital Improvements
|
| 8. |
Ordinance approving a design build agreement with CABASS VENTURES, LLC for emergency generator design and installations at seventeen Fire Stations and the San Antonio Fire Department (SAFD) Services Facility in the amount not-to-exceed $4,000,000, funded from the General Fund. [María Villagómez, Deputy City Manager; Valerie Frausto, Fire Chief]
|
| 9. |
Ordinance amending a contract with Keeley Construction Group, Inc. for the increased amount of $181,952.04 and a total contract value of $909,760.18, and for a six-month extension for additional construction services to complete non-service alley projects. Funding is from the FY 2025 General Fund Budget. [John Peterek, Interim Assistant City Manager; Razi Hosseini, Director, Public Works]
|
| 10. |
Ordinance amending the Professional Services Agreement with Structural Engineering Associates, Inc. for the increased amount of $1,066,441.13 and a total contract amount of $4,579,809.77 for additional civil engineering services for the South Zarzamora Street Overpass at Union Pacific Railroad and Frio City Road project. Funding is from 2017 General Obligation Bond funds included in the FY 2025 Capital Budget. [John Peterek, Interim Assistant City Manager; Razi Hosseini, Director, Public Works]
|
| 11. |
Ordinance amending the Professional Services Agreement with Lamb-Star Engineering, LLC for the increased amount of $316,112.56, and a total contract amount of $1,052,781.11 for additional civil engineering services for the North Frio Bike and Pedestrian Improvements (West Houston Street to Interstate Highway 10) project. San Antonio Water System will reimburse a total of $14,815 and CPS Energy will reimburse a total of $15,715. Funding is from the General Fund and included in the FY 2025 Capital Budget. [John Peterek, Interim Assistant City Manager; Razi Hosseini, Director, Public Works]
|
| 12. |
Ordinance approving an Advanced Funding Agreement between the City of San Antonio and the Texas Department of Transportation (TxDOT) and authorizing payment in an amount not to exceed $24,355 payable to TxDOT for administrative oversight of federal funds and accepting $2,018,115 in Highway Safety Improvements Program (HSIP) infrastructure to include improvements of traffic signals at four locations as FY 2025 Traffic Signal Installation projects. Funding is from the General Fund FY 2025 Adopted Budget. [John Peterek, Interim Assistant City Manager; Razi Hosseini, Director, Public Works]
|
| 13. |
Ordinance approving an Advanced Funding Agreement between the City of San Antonio and the Texas Department of Transportation (TxDOT) and accepting reimbursement in the estimated amount not to exceed $15,845,676 from TxDOT through their Transportation Alternatives Set-Aside Program for civil engineering and construction-related expenses for the Market Street Cycle Track Project. No City match is required. [John Peterek, Interim Assistant City Manager; Razi Hosseini, Director, Public Works]
|
| 14. |
Ordinance approving the 2025 Pavement Preservation Package 7 – Flatwork Task Order Contract with Bueno Pro Services, LLC. in an amount not to exceed $569,519.10 of which $31,100 will be reimbursed by San Antonio Water System for necessary adjustments to their existing infrastructure. Funding is from the General Fund and the Advanced Transportation District Fund included in the FY 2025 Capital Budget. [John Peterek, Interim Assistant City Manager; Razi Hosseini, Director, Public Works]
|
| 15. |
Ordinance approving the 2025 Pavement Preservation Package 8 – Flatwork Task Order Contract with F.D. Concrete, LLC in an amount not to exceed $512,777 of which $23,357 will be reimbursed by San Antonio Water System for necessary adjustments to their existing infrastructure. Funding is from the General Fund and the Advanced Transportation District Fund included in the FY 2025 Capital Budget. [John Peterek, Interim Assistant City Manager; Razi Hosseini, Director, Public Works]
|
| 16. |
Ordinance approving a construction contract with D&S Concrete Contractors LLC in the amount not to exceed $597,113 for the construction of the Bitters Road & Silverhorn Drive Retaining Wall Replacement project. Funding is from the 2017 General Obligation Bond and Great American Insurance funds included in the FY 2025 Capital Budget. [John Peterek, Interim Assistant City Manager; Razi Hosseini, Director, Public Works]
|
| 17. |
Ordinance approving a construction contract with RCO Construction, LLC in the amount not to exceed $1,539,073, of which $15,600 will be reimbursed by San Antonio Water System for necessary utility adjustments for the construction of intersection improvements related to Port San Antonio Area Streets project. Funding is from 2022 General Obligation Bond included in the FY 2025 Capital Budget. [John Peterek, Interim Assistant City Manager; Razi Hosseini, Director, Public Works]
|
|
|